Assembly of the drive into the chassis.

Shown is the components of the cutting deck disengagement. A single pivot assembly, that has an over centre operation in both directions.

The following photo's are in order of assembly.

1. Assemble the engine, belt, intermediate pully assembly, and the disengage lever into the body.
2. Install the gearshift in place.
3. Install the intermediate shaft, then the final drive shaft.
4. Install the primary shaft, ensuring the rose joint is connected to the sliding assembly, then the brake band, drive chains, etc.
5. Fit the hub drive covers and drive gears. Note, the wheels are shimmed to provide clearance for the drive gears.
6. The inside of the drive wheels showing the 58 tooth hub.
7. Drive ratios shown in schematic form.



[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]
[Linked Image]