Max, with the galvanizing there is a minimum charge and I think it is based on weight, I would have to check it out. I have a mate that gets a lot of pipework galvanized, I might be able to throw the bases in with a pile of his stuff. What doing a bunch of bases means that I would need to repair all the bases before I got them sand blasted which does take quite a bit of time

Last edited by NormK; 23/05/19 09:41 PM.